New Modeling Study Charts North Carolina’s Electric Grid Future Through 2050

Oct 26, 2026 | Projects

Energy Futures Group releases North Carolina Power Pathways report, prepared for the NC Energy Policy Task Force Technical Advisory Subcommittee

In August 2025, Governor Josh Stein signed Executive Order No. 23 creating the North Carolina Energy Policy Task Force (EPTF) and its Technical Advisory Subcommittee ("the Subcommittee"). To assist the Task Force, the North Carolina Office of the Governor commissioned Energy Futures Group (EFG) to lead a stakeholder-driven modeling exercise to inform engagement and action on a wide range of questions pertaining to the state's electricity system.

Working closely with the Subcommittee, EFG built a Base Case grounded in Duke Energy Carolinas' and Duke Energy Progress's initial 2025 Resource Plan assumptions, then modeled six Committee-determined alternative scenarios and two cost sensitivities to explore how different assumptions about load growth, large load customer behavior, resource costs, and technology availability could reshape the state's generation build-out, costs, and reliability. The report, released today, presents the full results of that analysis alongside supporting resources for stakeholders and the public.

Deliverables

  • Report: The full North Carolina Power Pathways report, detailing EFG's modeling methodology, scenario design, results, and conclusions for the Subcommittee and the public.
  • Dashboard: An interactive dashboard where users can explore modeling results across all scenarios and sensitivities.
  • Report Charts: A companion Excel workbook containing every chart included in the report, for readers who want to explore the underlying data directly.

Key Findings

  • Duke's current load growth and fossil retirement projections will require substantial construction of new generation. The magnitude, timing, and expected operation of new large load customers together, along with planned fossil retirements, will require construction of new gas-fired generation as part of a portfolio of other generating resources across all scenarios.
  • The load growth associated with new large-load customers makes a dramatic difference in cost and resource outcomes. In the Base Case, large load customers are responsible for 5.8 GW of increased demand by 2035. Load forecasting based on actual committed customer demand is a critical tool to mitigate the high risk associated with over-forecasting and large percentage of load growth driven by large customers.
  • To preserve North Carolina's progress toward its decarbonization goal, state utilities must build gigawatts of clean energy and storage resources. The Path to Net Zero Case indicates that beginning the transition to net zero emissions earlier and modifying certain assumptions about technology cost and availability (given supportive policies) may reduce overall costs.
  • Across all modeled scenarios except for those evaluating targeted large-load programs, system reliability is maintained. For scenarios examining targeted large load programs, reliability is contingent on the ability to implement large load flexibility, on customer willingness to participate in programs, and on the possibility of adjusted commitment order.
  • Heavy reliance on gas-fired generation may expose the system to cost risk, particularly from fuel price volatility.